Model: GPP-J105-60T4F-2SS. EPA Tier 4 Final.
105 KW GENPOWERUSA JOHN DEERE POWERED MOBILE GENERATOR, “EPA/CARB TIER 4 FINAL”
-BRAND NEW
-12GA GALVANIZED-STEEL SUPER SILENT ENCLOSUREGENERATOR POWER RATINGS:
-3PHASE 480/277V: 105 KW (131 KVA) 158A STANDBY, 96 KW (120 KVA) 144A PRIME, 0.8PF, 60HZ
-3PHASE 208/120V: 105 KW (131 KVA) 365A STANDBY, 96 KW (120 KVA) 333A PRIME, 0.8PF, 60HZ
-1PHASE 240/120V: 80 KW (80 KVA) 333A STANDBY, 73 KW (73 KVA) 304A PRIME, 1.0 PF, 60HZPOWERED BY PREMIUM HEAVY DUTY INDUSTRIAL COMPONENTS FOR MAXIMUM DURABILITY, EXCELLENT RELIABILITY AND WORLDWIDE SUPPORT:
-DIESEL ENGINE: JOHN DEERE 4045HFG09-3166, Turbocharged & Aftercooled, heavy duty diesel engine, 1800rpm, Electronic governor, U.S. EPA / CARB TIER 4 FINAL compliant
-EMISSIONS COMPLIANCE: U.S. EPA / CARB TIER 4 FINAL as per current U.S. Environmental Protection Agency regulations
-AC ALTERNATOR: LEROY SOMER LSA44.3M6, 12 Leads brushless alternator. IP23 drip-proof protection, Insulation class H. Electronic Automatic voltage regulation
-ADVANCED DIGITAL CONTROLLER: DEEPSEA DSE7420 MKII digital auto-start/stop control panel. All genset parameter, alarms and control functions. RS232 and RS485. UL LISTED
-CIRCUIT BREAKER: ABB 400AMP, Manual Main line circuit breaker, 3 poles, set mounted, wired and maximum output rated for complete generator protection . UL LISTEDCORROSION-RESISTANT GALVANIZED-STEEL ENCLOSURE FOR ENHANCED LONGEVITY AND EXCELLENT SOUND PERFORMANCE:
-ENCLOSURE CONSTRUCTION: 12GA, galvanized-steel panels with stainless steel hardware
-ENCLOSURE TYPE: IP56 rated Weather-proof, sound attenuated enclosure
-SOUND ATTENUATING MATERIAL: Up to 50 mm (2 in) of Acoustical Foam with urethane lining, designed to give maximum sound absorption. Flame resistant to UL94-HF1RENTAL-GRADE FEATURES FOR COMPLETE MOBILITY, TOTAL VERSATILITY AND MAXIMUM ROI:
-DOUBLE-WALLED FUEL TANK: 180Gal (680L), double walled, integral metallic fuel tank with electronic fuel level sender for control panel readings, alarms and shutdowns. Double-walled construction with 110% containment capability
-RUNTIME AUTONOMY (DIESEL): 32 Hours @ 75% load, 24 Hours @ 100% load
-ENVIRONMENTAL CONTAINMENT: 110% rated containment of oil, coolant and fuel
-VOLTAGE SELECTOR SWITCH: Manual voltage selector switch for effortless switching connections
-POWER DISTRIBUTION PANEL: Enclosure-surface mounted, rental-type, full distribution panel includes: 2x 15AMP duplex receptacles, 2x 50AMP twist lock receptacles, 1x FULL SET color coded camlocks, 1x FULL SET bus bars with 500mcm mechanical lugs
-SIMULTANEOUS OUTPUT: Simultaneous 1-phase/3-phase duplex-output: 139V output on duplex outlets while genset operates on 480/277V (does not require buck transformer)
-EXTERNAL SHORE POWER CONNECTOR: Externally mounted quick-connector provide convenient access to power the battery charger and coolant heater
-EXTERNAL CONNECTION PORTS: 4x externally mounted quick access ports installed on the enclosure for fuel supply, fuel return, oil drain and coolant drain
-DOUBLE CRITICAL-ACCESS EMERGENCY STOP BUTTONS: Recessed emergency-stop buttons installed separately on the enclosure
-BATTERY DISCONNECT SWITCH: Manually operated battery quick disconnect switch
-SHUNT TRIP: 12VDC shunt trip
-ACCIDENTAL SWITCHOVER PROTECTION: Automatic breaker shunt-trip in the case of accidental operation of the voltage selector switch while the engine is runningBRAND NEW AND FULLY PACKAGED RENTAL GENERATOR INCLUDES STANDARD:
-AUTO start/stop control feature included for remote start via 2-Wire dry contact
-Microprocessor based control panel
-12V charged DC starting battery with electrolyte and cables
-Mechanically welded chassis with anti-vibration isolators
-Each unit prototype and individually load bank tested prior to shipping in our Quality Controlled facilities in USA
-User guide, commissioning, and maintenance manual. Wiring diagrams included. (English)
-Compliant with ISO9001, ISO3046, ISO8528, BS4999, BS5514, BS5000PT99, AS1359, IEC34, UTE5100, VDE0530ENGINEERED FOR PRIME POWER AND PEACE OF MIND:
-QUALITY: 100% engineered and individually load bank tested in USA
-INTERNATIONAL WARRANTY: Industry-leading Comprehensive Parts AND Labor coverage for up to 1 YEAR / 2000 HOURS Prime Service Duty
-SOUND LEVELS: Super silent enclosure designed to meet and exceed North American Level 2 and European 2000/14EC Low sound level directivesGENERATOR DIMENSIONS:
-SKID MOUNTED: Please refer to exact-configuration drawings
-TRAILER MOUNTED: Please refer to exact-configuration drawings
105 kW John Deere Mobile Generator (T4F)
Return & Cancellation Policy
-
Order Cancellations: Orders cancelled after placement are subject to a 5% administrative fee.
-
Returns: Returns are accepted within 30 days of shipment only if the unit is unused and has never had fuel or oil added.
-
Fees: A 25% restocking fee applies to all authorized returns. Original and return shipping charges are non-refundable.
-
Inspection: Damage during transit must be noted on the Bill of Lading (BOL) at the time of delivery to be eligible for an insurance claim.
-
Government Contracts: For Prime Contractors and Federal Agencies, we honor all negotiated FAR/DFARS flow-down provisions as specified in the formal Purchase Order (PO).
-
Equipment Storage Requirements: Proper on-site storage is critical to maintaining the integrity of the alternator and electrical components.
-
Moisture Protection: If the generator is stored on-site prior to installation, it must be kept in a dry, covered, and well-ventilated environment.
-
Anti-Condensation Heaters: For units equipped with internal anti-condensation (space) heaters, the Buyer is responsible for providing a temporary 120V/240V power source to these heaters immediately upon delivery.
-
Validation: Heaters must remain energized during the entire storage period to keep the alternator windings above the dew point and prevent moisture absorption.
-
Liability: Failure to maintain the heaters or provide adequate dry storage may void the manufacturer’s warranty regarding insulation resistance (IR) and winding failure. We recommend performing an insulation test (Megger test) prior to the first start-up if the unit has been stored for more than 30 days.
-
